Transportation Safety Board
Symbol of the Government of Canada

  RAIL Reports - 2006 - R06V0183

Table of Contents

1.0 Factual Information

  • 1.1 The Accident
  • 1.2 Post Occurrence
  • 1.3 Emergency Response
  • 1.4 Site Examination
  • 1.5 The White Pass & Yukon Route
  • 1.6 Track Information
  • 1.7 Method of Train Control
  • 1.8 Employee Information
  • 1.9 Locomotive 114
  • 1.10 Ballast Cars
  • 1.11 Loading of the Ballast Cars
  • 1.12 Brake Shoe Force Test
    (TSB Engineering Laboratory Report LP 091/2006)
  • 1.13 Train Handling Procedures
  • 1.13.1 Cycle Braking
  • 1.14 TSB Engineering Laboratory Report LP 091/2006
  • 1.15 Heat Fade
  • 1.16 Transport Canada
  • 1.17 Safety Management System
  • 1.18 Training

2.0 Analysis

  • 2.1 Introduction
  • 2.2 The Accident
  • 2.3 Loading of the Ballast Cars
  • 2.4 Work Train Equipment Handling Procedures
  • 2.5 Train Handling Procedures
  • 2.6 Training
  • 2.7 Dynamic Brake
  • 2.8 Safety Management System
  • 2.9 Communication
  • 2.10 Emergency Response

3.0 Conclusions

  • 3.1 Findings as to Causes and Contributing Factors
  • 3.2 Findings as to Risk
  • 3.3 Other Findings

4.0 Safety Action

  • 4.1 Action Taken
  • 4.1.1 TSB Rail Safety Advisories
  • 4.1.2 Transport Canada
  • 4.1.3 White Pass and Yukon Route

Appendices

  • Appendix A - Glossary

Photos

Figures

Previous | Next