Transportation Safety Board of Canada
www.bst-tsb.gc.ca
REPORTS > RAIL > 2006 > R06V0183
Table of Contents
1.0 Factual Information
- 1.1 The Accident
- 1.2 Post Occurrence
- 1.3 Emergency Response
- 1.4 Site Examination
- 1.5 The White Pass & Yukon Route
- 1.6 Track Information
- 1.7 Method of Train Control
- 1.8 Employee Information
- 1.9 Locomotive 114
- 1.10 Ballast Cars
- 1.11 Loading of the Ballast Cars
- 1.12 Brake Shoe Force Test
(TSB Engineering Laboratory Report LP 091/2006)
- 1.13 Train Handling Procedures
- 1.13.1 Cycle Braking
- 1.14 TSB Engineering Laboratory Report LP 091/2006
- 1.15 Heat Fade
- 1.16 Transport Canada
- 1.17 Safety Management System
- 1.18 Training
2.0 Analysis
- 2.1 Introduction
- 2.2 The Accident
- 2.3 Loading of the Ballast Cars
- 2.4 Work Train Equipment Handling Procedures
- 2.5 Train Handling Procedures
- 2.6 Training
- 2.7 Dynamic Brake
- 2.8 Safety Management System
- 2.9 Communication
- 2.10 Emergency Response
3.0 Conclusions
- 3.1 Findings as to Causes and Contributing Factors
- 3.2 Findings as to Risk
- 3.3 Other Findings
4.0 Safety Action
- 4.1 Action Taken
- 4.1.1 TSB Rail Safety Advisories
- 4.1.2 Transport Canada
- 4.1.3 White Pass and Yukon Route
Appendices
Photos
Figures