These documents are the final versions of occurrence investigation reports as approved by the Transportation Safety Board. The TSB assumes no responsibility for any discrepancies that may have been transmitted with the electronic versions. The printed versions of the documents stand as the official record.
14 April 2002 — Natural Gas Pipeline Rupture,
TransCanada PipeLines,
Line 100-3, 914-Millimetre-Diameter Line,
Main-Line Valve 31-3 + 5.539 Kilometres,
Near the Village of Brookdale, Manitoba
Report Number P02H0017 HTML PDF [479 Kb]
07 December 2002 — Refined Product Pipeline Rupture,
Trans-Northern Pipelines Inc.,
273.1-millimetre-diameter Mainline,
Kilometre Post 63.57,
Near Saint-Clet, Quebec
Report Number P02H0052 HTML PDF [438 Kb]